LIVE Gold Prices $  | E-Mail Subscriptions | Update GoldSeek | GoldSeek Radio 

Commentary : Gold Review : Markets : News Wire : Quotes : Silver : Stocks - Main Page 

 GoldSeek.com >> News >> Story  Disclaimer 
 
Latest Headlines

GoldSeek.com to Launch New Website
By: GoldSeek.com

Is Gold Price Action Warning Of Imminent Monetary Collapse Part 2?
By: Hubert Moolman

Gold and Silver Are Just Getting Started
By: Frank Holmes, US Funds

Silver Makes High Wave Candle at Target – Here’s What to Expect…
By: Clive Maund

Gold Blows Through Upside Resistance - The Chase Is On
By: Avi Gilburt

U.S. Mint To Reduce Gold & Silver Eagle Production Over The Next 12-18 Months
By: Steve St. Angelo, SRSrocco Report

Gold's sharp rise throws Financial Times into an erroneous sulk
By: Chris Powell, GATA

Precious Metals Update Video: Gold's unusual strength
By: Ira Epstein

Asian Metals Market Update: July-29-2020
By: Chintan Karnani, Insignia Consultants

Gold's rise is a 'mystery' because journalism always fails to pursue it
By: Chris Powell, GATA

 
Search

GoldSeek Web

 
Fire River Gold Update on Progress of the Nixon Fork Mine Start Up


-- Posted Thursday, 25 August 2011 | | Disqus

VANCOUVER, Aug. 25, 2011 /PRNewswire/ - Fire River Gold Corp. and Mystery Creek Resources Inc. (TSX.V: FAU), (OTCQX: FVGCF), (FSE: FWR) (collectively "the Company") are pleased to provide this update for the Nixon Fork Mine. It provides a summary of the progress of mining and milling activities.

Mill commissioning started on July 4th 2011 and it has operated since that time at an average availability of 71%. A total of 3,078 tons of ore was processed in July and approximately 2,500 so far this month. Only gravity and flotation circuits are being operated at this time, while the CIL plant is still under construction. The current mill feed head grade is averaging approximately 20 g/t.

Over 30 tonnes of copper concentrate has been produced containing 18% Cu, 779 g/t Au, and 398 g/t Ag. A total of 21 bags of concentrate weighing 18,300 kg have been shipped to Anchorage using a Hercules L-100 aircraft.

The concentrate has been markedly improved in comparison to the last production period by increasing the grades and decreasing the moisture content as follows:

The moisture content has been further reduced to less than 6% in the most recent bags.

Gravity separation has recovered approximately 500 ounces of gold in the gravity concentrate, which will be poured into a 30 kg doré bar.

Total gold recovery has averaged 78% (24% from gravity and 54% in the copper concentrate) which is close to expectations. By comparison, recovery averaged 68% in 2007. Total gold recovery will increase substantially with the addition of leaching as a third gold recovery process.

Approximately 4,000 tonnes of ore has been mined to-date from five stopes using room and pillar extraction. The mine is currently producing approximately 170 tonnes per day at a grade of 18 g/t.

The property is evaluating other stoping methods, including longhole to reduce costs and increase productivity. Equipment has been acquired to test these other methods, including a remote control scooptram and drill buggy. Non-explosive ore extraction is also being tested using scaling machines with considerable success.

The Qualified Person for this news release is Richard Goodwin, P.Eng, President & C.O.O for Fire River Gold.

On behalf of the Board of Directors,

(Signed)

Richard Goodwin
President & C.O.O.

http://www.firerivergold.com/s/Home.asp

Certain information regarding the Company including management's assessment of future plans and operations, may constitute forward-looking statements under applicable securities laws and necessarily involve risks associated with mining exploration and development, volatility of prices, currency fluctuations, imprecision of resource estimates, environmental and permitting risks, access to labour and services, competition from other companies and ability to access sufficient capital. As a consequence, actual results may differ materially from those anticipated in the forward-looking statements. A feasibility study has not been completed and there is no certainty the disclosed targets will be reached nor that the proposed operations will be economically viable. Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. We seek safe harbour.


-- Posted Thursday, 25 August 2011 | Digg This Article | Source: GoldSeek.com

comments powered by Disqus







 



Increase Text SizeDecrease Text SizeE-mail Link of Current PagePrinter Friendly PageReturn to GoldSeek.com

 news.goldseek.com >> Story

E-mail Page  | Print  | Disclaimer 


© 1995 - 2019



GoldSeek.com Supports Kiva.org

© GoldSeek.com, Gold Seek LLC

The content on this site is protected by U.S. and international copyright laws and is the property of GoldSeek.com and/or the providers of the content under license. By "content" we mean any information, mode of expression, or other materials and services found on GoldSeek.com. This includes editorials, news, our writings, graphics, and any and all other features found on the site. Please contact us for any further information.

Live GoldSeek Visitor Map | Disclaimer


Map

The views contained here may not represent the views of GoldSeek.com, Gold Seek LLC, its affiliates or advertisers. GoldSeek.com, Gold Seek LLC makes no representation, warranty or guarantee as to the accuracy or completeness of the information (including news, editorials, prices, statistics, analyses and the like) provided through its service. Any copying, reproduction and/or redistribution of any of the documents, data, content or materials contained on or within this website, without the express written consent of GoldSeek.com, Gold Seek LLC, is strictly prohibited. In no event shall GoldSeek.com, Gold Seek LLC or its affiliates be liable to any person for any decision made or action taken in reliance upon the information provided herein.