LIVE Gold Prices $  | E-Mail Subscriptions | Update GoldSeek | GoldSeek Radio 

Commentary : Gold Review : Markets : News Wire : Quotes : Silver : Stocks - Main Page 

 GoldSeek.com >> News >> Story  Disclaimer 
 
Latest Headlines

GoldSeek.com to Launch New Website
By: GoldSeek.com

Is Gold Price Action Warning Of Imminent Monetary Collapse Part 2?
By: Hubert Moolman

Gold and Silver Are Just Getting Started
By: Frank Holmes, US Funds

Silver Makes High Wave Candle at Target – Here’s What to Expect…
By: Clive Maund

Gold Blows Through Upside Resistance - The Chase Is On
By: Avi Gilburt

U.S. Mint To Reduce Gold & Silver Eagle Production Over The Next 12-18 Months
By: Steve St. Angelo, SRSrocco Report

Gold's sharp rise throws Financial Times into an erroneous sulk
By: Chris Powell, GATA

Precious Metals Update Video: Gold's unusual strength
By: Ira Epstein

Asian Metals Market Update: July-29-2020
By: Chintan Karnani, Insignia Consultants

Gold's rise is a 'mystery' because journalism always fails to pursue it
By: Chris Powell, GATA

 
Search

GoldSeek Web

 
Timmins Gold Corp. Announces Updated Reserve and Resource Estimates for the San Francisco Gold Project


-- Posted Tuesday, 20 September 2011 | | Disqus

104% Increase in Proven & Probable Reserves over 2010

VANCOUVER, BRITISH COLUMBIA--(Marketwire -09/20/11)- Timmins Gold Corp. ("Timmins Gold" or the "Company") (TSX: TMM.TO, TMGOF.PK) is pleased to announce an updated reserve and resource estimate for the San Francisco Gold Project in the state of Sonora, Mexico that was previously updated on November 30, 2010. The National Instrument 43-101 ("NI 43-101") Technical Reports describing the details of the updated reserve and resource estimates will be filed on SEDAR (www.sedar.com) within 45 days from the date of this press release.

The Mineral Reserve and Resource estimate was prepared by MICON International Ltd. of Toronto. Ontario, using the Canadian Institute of Mining ("CIM") definitions for Mineral Reserves as required by NI 43-101. The updated mineral reserve and resource for the San Francisco Project which includes the nearby La Chicharra open pit is derived from information obtained from a drill program of 700 holes of core and reverse circulation drilling totaling 94,193 meters completed between July, 2010 and June, 2011. The past producing La Chicharra open pit is located 2 kilometres west of the San Francisco open pit. The updated proven and probable reserves for the San Francisco open pit have been estimated at 1,214,000 ounces of gold, represented by 64,245,000 tonnes at 0.588 g/t gold. The updated proven and probable reserves for the La Chicharra open pit have been estimated at 116,000 ounces of gold represented by 8,146,000 tonnes at 0.445 g/t gold. This is a 104% increase over the proven and probable reserves of 780,000 ounces (34,932,000 tonnes at 0.695 grams per tonne), net of production depletion of 129,000 gold ounces.

The Mineral Reserves are based on a gold price of US$1,100 per ounce. The reserve includes a dilution factor of 8.3% that takes into account the dilution of partially mineralized blocks in the model. An internal cutoff grade of 0.14 g/t gold was used for the proven and probable reserve estimate. Weighted average LOM gold recovery is estimated at 68.6% based on the new geological model and the respective metallurgical recoveries for each rock type generated for the deposit.

"This is a significant milestone for the Company, and the updated reserves now outline a 10 year mine life with a projected production rate of 100,000 gold ounces per annum. Based on the success of this drill program, the Company continues to drill aggressively at San Francisco and La Chicharra, and anticipates completing an additional 120,000 metres of drilling from July, 2011 to December, 2011," stated Mr. Bruce Bragagnolo, CEO of Timmins Gold Corp.

This press release was reviewed and prepared by Lawrence A. Dick, Ph.D., P.Geo, a director of the Company, who is recognized as a Qualified Person under the guidelines of National Instrument 43-101 and by Miguel Soto, P. Geo., a director and the COO of the Company. Pursuant to NI 43-101, Mr. William Lewis, B.Sc., P.Geo. and Mr. Mani Verma, M.Eng., P.Eng., both of Micon International Ltd, (Micon), of Toronto, Ontario are the independent Qualified Persons responsible for the Mineral Reserve and Mineral Resource Estimate. Each of Mr. Lewis, Mr. Verma, Mr. Dick and Mr. Soto have read and approved the contents of this news release. The mineral resource has been rounded to reflect that the numbers are estimates.

About Timmins Gold

Focused solely in Mexico, Timmins Gold Corp. is in commercial gold production at its wholly owned San Francisco gold mine in Sonora, Mexico. The mine is a past-producing open pit heap leach operation. Timmins Gold has forecast production at a rate in excess of 100,000 ounces of gold per year at a life of mine cash cost. (Micon International NI 43-101F1 Technical Report dated November, 2010). The updated MICON International NI 43-101 Technical Report will be filed within 45 days.

This News Release contains forward-looking statements. Forward-looking statements are statements which relate to future events. In some cases, you can identify forward-looking statements by terminology such as "may", "should", "expects", "plans, "anticipates", believes", "estimates", "predicts", "potential", or "continue" or the negative of these terms or other comparable terminology. These statements are only predictions and involve known and unknown risks, uncertainties and other factors that may cause our or our industry's actual results, level of activity, performance or achievements to be materially different from any future results, levels of activity, performance, or achievements expressed or implied by these forward-looking statements.

While these forward-looking statements, and any assumptions upon which they are based, are made in good faith and reflect our current judgment regarding the direction of our business, actual results will almost always vary, sometimes materially, from any estimates, predictions, projections, assumptions or other future performance suggestions herein. Except as required by applicable law, Timmins Gold does not intend to update any forward-looking statements to conform these statements to actual results.

Neither TSX nor its Regulation Services Provider (as that term is defined in the policies of the TSX accepts responsibility for the adequacy or accuracy of this release.

Contact:

Timmins Gold Corp.
Mr. Bruce Bragagnolo, LLB
Chief Executive Officer
604-638-8980
bruce@timminsgold.com
www.timminsgold.com


-- Posted Tuesday, 20 September 2011 | Digg This Article | Source: GoldSeek.com

comments powered by Disqus







 



Increase Text SizeDecrease Text SizeE-mail Link of Current PagePrinter Friendly PageReturn to GoldSeek.com

 news.goldseek.com >> Story

E-mail Page  | Print  | Disclaimer 


© 1995 - 2019



GoldSeek.com Supports Kiva.org

© GoldSeek.com, Gold Seek LLC

The content on this site is protected by U.S. and international copyright laws and is the property of GoldSeek.com and/or the providers of the content under license. By "content" we mean any information, mode of expression, or other materials and services found on GoldSeek.com. This includes editorials, news, our writings, graphics, and any and all other features found on the site. Please contact us for any further information.

Live GoldSeek Visitor Map | Disclaimer


Map

The views contained here may not represent the views of GoldSeek.com, Gold Seek LLC, its affiliates or advertisers. GoldSeek.com, Gold Seek LLC makes no representation, warranty or guarantee as to the accuracy or completeness of the information (including news, editorials, prices, statistics, analyses and the like) provided through its service. Any copying, reproduction and/or redistribution of any of the documents, data, content or materials contained on or within this website, without the express written consent of GoldSeek.com, Gold Seek LLC, is strictly prohibited. In no event shall GoldSeek.com, Gold Seek LLC or its affiliates be liable to any person for any decision made or action taken in reliance upon the information provided herein.