LIVE Gold Prices $  | E-Mail Subscriptions | Update GoldSeek | GoldSeek Radio 

Commentary : Gold Review : Markets : News Wire : Quotes : Silver : Stocks - Main Page 

 GoldSeek.com >> News >> Story  Disclaimer 
 
Latest Headlines

GoldSeek.com to Launch New Website
By: GoldSeek.com

Is Gold Price Action Warning Of Imminent Monetary Collapse Part 2?
By: Hubert Moolman

Gold and Silver Are Just Getting Started
By: Frank Holmes, US Funds

Silver Makes High Wave Candle at Target – Here’s What to Expect…
By: Clive Maund

Gold Blows Through Upside Resistance - The Chase Is On
By: Avi Gilburt

U.S. Mint To Reduce Gold & Silver Eagle Production Over The Next 12-18 Months
By: Steve St. Angelo, SRSrocco Report

Gold's sharp rise throws Financial Times into an erroneous sulk
By: Chris Powell, GATA

Precious Metals Update Video: Gold's unusual strength
By: Ira Epstein

Asian Metals Market Update: July-29-2020
By: Chintan Karnani, Insignia Consultants

Gold's rise is a 'mystery' because journalism always fails to pursue it
By: Chris Powell, GATA

 
Search

GoldSeek Web

 
Batero Gold Provides Corporate Update


-- Posted Thursday, 5 May 2011 | | Source: GoldSeek.com

VANCOUVER, BRITISH COLUMBIA - May 05, 2011 - Batero Gold Corp. (TSX-V:BAT, BELDF.PK) announces that the company has recently completed its Phase 1, 16,000 metre drill program and is now well underway with its Phase 2 drill program that will comprise an additional 24,000 metres of drilling at its Batero-Quinchia Project in Risaralda Department, Republic of Colombia. To date the company has press released eleven diamond drill holes (DDH) totaling 5,481.90 metres.  Thirty two drill holes have now been completed at the Project.  The company anticipates to press release the next batch of drill results in the coming week dependent upon receiving the final drill hole result from the laboratory.  The results to be reported will comprise further definition and clarity of the La Cumbre porphyry Target. The company has also received limited results from three exploration drill target areas at the Project and currently have more than 6,000 metres of drill core prepped and/or delivered and waiting in queue at the laboratory.  The company is evaluating secondary assaying alternatives as the wait times have increased significantly in recent months due to the aggressive expansion in Colombia's exploration drilling industry.

 

Currently there are six drills turning at the Project with an additional two drills to arrive on site in the coming week.  The company's ongoing drill plan is four drills at La Cumbre porphyry to continue to delineate the target which continues to be open to the north-northwest and south-southeast and also to drill a 1,000 metre hole that commenced April 28, 2011 to test the depth extent of the Target.  Additionally, the drill program has graduated at La Cumbre with the recent start-up of a systematic in-fill drill program.  These drill programs at La Cumbre will generate a NI-43-101 compliant resource estimate during the second half of 2011. 

 

The fifth drill at the Project continues turning approximately one kilometer to the northeast of La Cumbre targeting high priority geochemical and coincident geophysical anomalies and the sixth drill has recently been mobilized to a priority new target area south of Dos Quebradas and north of La Lenguita.  At this priority target area a geological surface contact has been identified.  This contact differentiates similar rock of the previously drilled Dos Quebradas porphyry and to the south of the contact strongly metamorphosed hornfel rocks.   Initially, the company plans to drill the contact zone with the drill plan to systematically drill north from the contact zone towards the known mineralized porphyry body at Dos Quebradas.  The final goal of this drill program is to consolidate the target's potential copper and gold ounces simultaneously with La Cumbre's potential copper and gold ounces into the same NI-43-101 resource estimate anticipated to be published during the second half of 2011. 

 

 

ON BEHALF OF THE BOARD OF

BATERO GOLD CORP.

 

Brandon Rook

 

Brandon Rook,

President & CEO

Batero Gold Corp.

 

For further information please contact:

Batero Gold Corp.

Tel: 604.568.6378 or

info@baterogold.com

 

About Batero Gold:

 

Batero Gold Corp. (TSX-V:BAT) is a Vancouver-based precious and base metals exploration and development company focused in Colombia's emerging and prolific Mid-Cauca porphyry gold and copper belt. Batero is located within the Quinchia district and has 100% ownership in the Batero-Quinchia Project, comprising a 1407 hectare tenement. The Batero-Quinchia Project includes three known gold porphyry target centres. The Quinchia district and Batero's project is considered socially stable and mining friendly and is supported with a comprehensive infrastructure network. Batero has assembled a strong management and technical team in Colombia whom have contributed to numerous significant discoveries throughout Colombia. Batero plans to leverage its share structure with strategic local and regional relationships, and long-term financial partners, to develop its prospective project into what the Company believes will be Colombia's next major mining venture.

 

FORWARD LOOKING STATEMENTS: This press release contains forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words expects, plans, anticipates, believes, intends, estimates, projects, potential and similar expressions, or that events or conditions will, would, may, could or should occur. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in forward looking statements. Forward-looking statements are based on the beliefs, estimates and opinions of the Company's management on the date such statements were made. The Company expressly disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise.

 

"Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

 

=======================================================================

Copyright (c) 2011 BATERO GOLD CORPORATION (TSX-V: BAT)  All rights reserved.  For more information visit our website at http://www.baterogold.com/ or send mailto:info@baterogold.com
-- Posted Thursday, 5 May 2011 | Digg This Article | Source: GoldSeek.com









 



Increase Text SizeDecrease Text SizeE-mail Link of Current PagePrinter Friendly PageReturn to GoldSeek.com

 news.goldseek.com >> Story

E-mail Page  | Print  | Disclaimer 


© 1995 - 2019



GoldSeek.com Supports Kiva.org

© GoldSeek.com, Gold Seek LLC

The content on this site is protected by U.S. and international copyright laws and is the property of GoldSeek.com and/or the providers of the content under license. By "content" we mean any information, mode of expression, or other materials and services found on GoldSeek.com. This includes editorials, news, our writings, graphics, and any and all other features found on the site. Please contact us for any further information.

Live GoldSeek Visitor Map | Disclaimer


Map

The views contained here may not represent the views of GoldSeek.com, Gold Seek LLC, its affiliates or advertisers. GoldSeek.com, Gold Seek LLC makes no representation, warranty or guarantee as to the accuracy or completeness of the information (including news, editorials, prices, statistics, analyses and the like) provided through its service. Any copying, reproduction and/or redistribution of any of the documents, data, content or materials contained on or within this website, without the express written consent of GoldSeek.com, Gold Seek LLC, is strictly prohibited. In no event shall GoldSeek.com, Gold Seek LLC or its affiliates be liable to any person for any decision made or action taken in reliance upon the information provided herein.