Advertise | Bookmark | Contact Us | E-Mail List |  | Update Page | 

Commentary : Gold Review : Markets : News Wire : Quotes : Silver : Stocks - Main Page >> News >> Story  Disclaimer 
Latest Headlines

Gold Seeker Closing Report: Gold and Silver Gain Roughly 2% After Fed
By: Chris Mullen, Gold Seeker Report

Ira Epstein's Metals Video 3 21 2018
By: Ira Epstein

SSR Mining begins drilling at Eagles Plains (TSX-V: EPL) Fisher Gold Property
By: Nicholas LePan,

JPMorgan's Domination of COMEX Silver
By: Craig Hemke

Can Central Banks Manage the Deflation of an Everything Bubble?
By: Graham Summers

No, gold leased from central banks doesn't always have to be returned
By: Chris Powell

Why the World’s Central Banks hold Gold – In their Own Words
By: Ronan Manly

WATCH OUT BELOW: Dow Jones Index Next Stop… 19,000
By: Steve St. Angelo

Additional Signs for PMs Amid Increasing FOMC Tension
By: Przemyslaw Radomski, CFA

Credit Concerns In U.S. Growing As LIBOR OIS Surges to 2009 High
By: GoldCore


GoldSeek Web

Calico’s Preliminary Economic Assessment Report Now Available to the Public

 -- Published: Thursday, 19 March 2015 | Print  | Disqus 

March 2, 2015, Vancouver, B.C.- Calico Resources Corp. (TSX-V: CKB) (“Calico” or the “Company”) reports that it has filed on SEDAR, a Preliminary Economic Assessment (“PEA”) and associated National Instrument 43-101 “(NI 43-101”) Technical Report for the Company’s 100% owned Grassy Mountain Project, located in Malheur County, Oregon. The report is dated as at February 27, 2015 and was prepared by Mining Metal Consultants, LLC (“MMC”). The Company announced the results of the PEA on January 13, 2015.

MMC has concluded that the Grassy Mountain Project represents an excellent economic opportunity in the current gold price environment. The PEA states that the most attractive development scenario for the Grassy Mountain Project consists of an underground mining operation with a processing plant handling mineralized material, producing a gold-silver doré. A milling base case scenario was developed for the Grassy Mountain Project with production of 365,000 tons per year, resulting in a projected nine year operation with estimated average annual production of 53,000 ounces of gold and 82,000 ounces of silver. Projected life of mine average cash operating costs are US$578 per ounce of gold recovered, net of silver byproduct credits. Start-up capital costs are projected to be US$119.6 million plus sustaining capital of $24.1 million. The total cost of gold production (including cash operating costs and total capital and contingency costs over the life of the mine) is estimated at US$880 per ounce.

At a gold price of US$1,300 per ounce and a silver price of $17.50 per ounce, the base case has a US$202.9 million pre-tax net cash flow, a US$144.2 million net present value at a 5% discount rate and an internal rate of return of 32.6%. At US$1,500 gold and US$20 silver, the total pre-tax net cash flow increases by 47.5% over the base case to US$299.2 million, the net present value at 5% increases to US$221.9 million and the internal rate of return improves to 45.1%.

MMC chose prices of US$1,300 for gold and US$17.50 for silver as the base case economic scenario as these prices approximate the trailing three year averages for gold and silver. The PEA is considered preliminary in nature. Mineral resources are not mineral reserves and do not have demonstrated economic viability. The base case, lower price case and higher price case economic results for the metal price assumptions are as follows:

Projected Economic Results (US$)

Base CaseLower Price CaseHigher Price Case
Gold Price per Ounce

Silver Price per Ounce







Pre-tax Net Cash Flow$202.9 million$106.5 million$299.2 million
Pre-tax NPV @ 5% Discount Rate$144.2 million$66.5 million$221.9 million
Pre-tax Internal Rate of Return32.6%19.0%45.1%
Operating Costs per Ounce of Gold produced (Life-of-Mine)$578$580$577
Total Costs per Ounce of Gold Produced (Includes all Capital)$880$882$879
After-tax Net Cash Flow$157.0 million$89.6 million$224.5 million
After-tax NPV @ 5% Discount Rate$107.7 million$52.8 million$162.6 million
After-tax Internal Rate of Return27.1%16.4%37.4%

Authors and Qualified Persons

The NI 43-101 Technical Report was prepared by Metal Mining Consultants Inc. of Highlands Ranch, Colorado under the supervision of Scott E. Wilson, CPG, who is an independent “Qualified Person” (as defined under NI 43-101).

Michael F. McGinnis, Calico’s Project Manager/Exploration, is the Company’s designated Qualified Person for this news release within the meaning of National Instrument 43-101 and has reviewed and validated that the information contained in this news release is consistent with that provided by the Qualified Persons responsible for the PEA.

The report is now available to the public on SEDAR and accessible through or it may be accessed on the Company’s website: under Technical Reports.

About Calico

Calico owns a 100% interest in the advanced stage Grassy Mountain gold project in Oregon. Please see the Company’s website at for more information.

On behalf of the Board,

Paul A. Parisotto

President & CEO


This news release does not constitute an offer to sell or a solicitation of an offer to buy or sell securities in the United States. The securities have not been and will not be registered under the United States Securities Act of 1933, as amended, or any state securities laws and may not be offered or sold within the United States or to U.S. Persons unless an exemption from such registration is available.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Statement

This document contains “forward-looking statements” within the meaning of applicable Canadian securities regulations. All statements other than statements of historical fact herein, including, without limitation, statements regarding exploration plans and other future plans and objectives, are forward-looking statements that involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate and future events and actual results could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from our expectations are disclosed in the Company’s documents filed from time to time via SEDAR with the Canadian regulatory agencies to whose policies we are bound.

For more information please contact: Paul A. Parisotto at 1 855-589-0400 or you can refer to the Company’s website:

| Digg This Article
 -- Published: Thursday, 19 March 2015 | E-Mail  | Print  | Source:

comments powered by Disqus


Increase Text SizeDecrease Text SizeE-mail Link of Current PagePrinter Friendly PageReturn to >> Story

E-mail Page  | Print  | Disclaimer 

© 1995 - 2017 Supports

©, Gold Seek LLC

The content on this site is protected by U.S. and international copyright laws and is the property of and/or the providers of the content under license. By "content" we mean any information, mode of expression, or other materials and services found on This includes editorials, news, our writings, graphics, and any and all other features found on the site. Please contact us for any further information.

Live GoldSeek Visitor Map | Disclaimer

The views contained here may not represent the views of, its affiliates or advertisers. makes no representation, warranty or guarantee as to the accuracy or completeness of the information (including news, editorials, prices, statistics, analyses and the like) provided through its service. Any copying, reproduction and/or redistribution of any of the documents, data, content or materials contained on or within this website, without the express written consent of, is strictly prohibited. In no event shall or its affiliates be liable to any person for any decision made or action taken in reliance upon the information provided herein.