Goldsource Provides Q4 2016 Production Results; Plans for 2017
-- Published: Monday, 9 January 2017 | Print | Disqus
VANCOUVER, BC – January 9, 2017 – Goldsource Mines Inc. (“Goldsource” or the “Company”) announces the fourth quarter (“Q4”) and annual production results for the year ending December 31, 2016 and development plans for 2017 at its Eagle Mountain Gold Project (“Eagle Mountain”) located in Guyana, South America.
Eagle Mountain Production Highlights Q4, 2016 vs Q3, 2016
Processed 39,513 tonnes; 13% increase.
Average throughput of 527 tpd; 13% increase.
Estimated gravity recovery to concentrate of 27%; 8% increase.
253 gold ounces produced; 45% increase.
353.3 gold ounces sold; 425% increase.
Ioannis Tsitos, President, commented, “We continue to make improvements at Eagle Mountain by increasing throughput and gold recovery through our optimization program with the goal of achieving free cash flow from operations. In Q4, throughput increased 13% and plant recoveries increased by 8% which, when combined with improved mine grades, led to a gold production increase of 45% compared to previous quarter. The process plant (“Main Plant”) was shut down on December 23rd for equipment installation including replacement of pipelines, pumps and a Krebs cyclone which should further increase throughput and recovery in early 2017. Beginning early February we plan to operate a low cost “Secondary” gravity operation and reduce corporate and in-country costs to supplement cash flow. Overall, 2016 was a challenging year with a variety of factors affecting throughput and lower than expected recovery. Management remains optimistic that the initiatives scheduled in early 2017 will further address the throughput and recovery issues. In association with ongoing work, we will consider permitting a substantially larger operation supported by a planned expansion of saprolite resources.”
Eagle Mountain Gold Mine Statistics(2)(3)
Q4, 2016 Total
Q3, 2016 Total
% Change (Q4 vs Q3)
2016 Total / Average
Mined tonnes
46,784
35,473
32%
142,766
Processed tonnes at minus 2mm
39,513
35,043
13%
131,396
Average tpd(1) processed
527
467
13%
477
Average estimated gold grade, gpt
0.98
0.91
8%
0.74
Estimated gravity recovery for plant
27%
25%
8%
31%
Estimated gravity recovery for table
90%
75%
20%
71%
Gold ounces produced
253.0
175.0
45%
620.9
Gold ounces sold
353.3
67.3
425%
620.9
Based on 25 operating days per month.
All numbers are rounded.
Daily production sampling at site is analyzed offsite at Actlabs in Georgetown, Guyana, which is an independent certified lab. Standard practice mined volumes are used and drill hole assays, also from Actlabs, are used for mine reconciliation.
During Q4, 2016, Eagle Mountain processed 39,513 tonnes of material (Q3, 2016: 35,043 tonnes), with an average of 527 tpd (Q3, 2016: 467 tpd) grading 0.98 gpt gold. As previously announced in the Company’s revised production guidance (see news release dated November 14, 2016), operations in the second half of the year were interrupted by equipment delivery delays, faulty pumps, and drought conditions. In November, the process was altered to bypass the recirculation of plus 2mm oversize material and to stockpile it in inventory. This significantly decreased plant maintenance requirements with less downtime and improved throughput. By mid-December, operations were running continuously at near capacity. In December (to the 23rd), the mine operated for 18 days, processing 12,497 tonnes of material at an average throughput rate of 694 tonnes per day. Estimated gravity recovery to concentrate averaged 27% for Q4, 2016 (Q3, 2016: 25%).
In Q4, 2016, the Company poured 253.0 ounces of gold and sold 353.3 ounces of gold at an average realized price of US$1,232 per ounce.
While onsite management was able to incrementally improve gravity gold recovery to concentrate in Q4 to 27% (up from 25% in Q3), the recovery rate remains well below design of 35-40% for a gravity only operation. As a result, the Main Plant at Eagle Mountain was shut down on December 23, 2016 and one half of the workforce at Eagle Mountain was released to reduce in country costs while the Company completes further plant modifications intended to improve throughput and recovery.
In 2017, Goldsource plans to:
Install a Krebs cyclone in the Main Plant to de-slime the scrubbed material prior to gravity recovery through the Falcon concentrators. This should result in a significant improvement in the recovery of fine gold to concentrate. The cyclone delivery to Eagle Mountain is scheduled for late January, with the goal of restarting of the Main Plant to test for increased recovery in February.
Install a HDPE slurry pipeline to replace the current 1,200 metres of PVC pipeline. This should allow the process plant to operate more reliably reducing losses of production due to pipe bursts. The HDPE slurry pipeline is onsite and is being prepared for installation.
Install and operate a low cost Secondary gravity operation. The Company is currently making preparations to begin a sluice operation to process colluvium, alluvium and some saprolite gold resources. Set up and initial production for this operation should be completed by late January.
Complete a low cost drilling campaign to increase the Company’s current NI 43-101 saprolite (indicated and inferred) resources, which are estimated at 380,000 gold ounces. Drill results may expand the saprolite resource with the goal of supporting a large scale, low strip, gravity-cyanidation operation at Eagle Mountain.
Depending on results for saprolite resource expansion in H1, 2017, initiate a Pre-Feasibility Study in late 2017 for a large scale operation. As part of this study, the Company will do further environmental work to start the permitting process for a large scale operation.
The Qualified Person under National Instrument 43-101 - Standards of Disclosure for Mineral Projects for this news release is N. Eric Fier, CPG, P.Eng, and Chief Operating Officer for Goldsource, who has reviewed and approved its contents.
Ioannis (Yannis) Tsitos President Goldsource Mines Inc.
For Further Information: Goldsource Mines Inc. Contact: Ioannis (Yannis) Tsitos, President Fred Cooper, Investor Relations Telephone: +1 (604) 694-1760 Fax: +1 (604) 694-1761 Toll Free: 1-866-691-1760 (Canada & USA) Email: info@goldsourcemines.com Website: www.goldsourcemines.com 570 Granville Street, Suite 501 Vancouver, British Columbia V6C 3P1
CAUTIONARY STATEMENT AND FORWARD-LOOKING DISCLAIMER
Management’s production decision for the Eagle Mountain Gold Project is not based on a feasibility study of mineral reserves demonstrating economic and technical viability. This project has a much higher risk of economic or technical failure and may adversely impact the Company’s projected profits, if any. The risks associated with this decision are set forth in the Company’s latest annual management’s discussion and analysis available on the Company’s website and the under Goldsource’s SEDAR profile on www.sedar.com.
This news release contains “forward-looking statements” within the meaning of Canadian securities legislation. Such forwardâ€'looking statements concern Goldsource’s strategic plans and expectations for the development of the Eagle Mountain Gold Project based on the PEA and variations to mining plans as mining operations progress and decrease gold production is encountered; the amount of future production of gold over any period; cash operating costs per ounce of gold; life of mine; estimated pre-production cost; the amount of expected grades and ounces of metals, gold recoveries mine life and gold production rates of the Eagle Mountain Gold Project; and expectations regarding the Company’s ability to manage capital resources and meet working capital requirements. Such forwardâ€'looking statements or information are based on a number of assumptions, which may prove to be incorrect. Assumptions have been made regarding, among other things: conditions in general economic and financial markets; ability to realize the PEA and develop and finance the project and ability to positively adjust mining operations when assumptions and expectations on which mining operations are based are not fully met; accuracy of the interpretations and assumptions used in calculating inferred mineral resource estimates; availability of mining equipment; availability of skilled labour; timing and amount of capital expenditures; performance of available laboratory and other related services; and future operating costs. The actual results could differ materially from those anticipated in these forwardâ€'looking statements as a result of the risk factors including: the timing and content of work programs; results of exploration activities and development of mineral properties; the interpretation of drilling results and other geological data; the uncertainties of resource estimations; uncertainty as to actual capital costs, operating costs, production and economic returns at the Eagle Mountain Gold Project; reliance on the PEA for initial mining operations and on management decisions to appropriately adjust mining operations and depart from mining plans contemplated in the PEA when considered warranted; and general market and industry conditions. Forward-looking statements are based on the expectations and opinions of the Company’s management on the date the statements are made. The assumptions used in the preparation of such statements, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, readers are cautioned not to place undue reliance on these forward-looking statements, which speak only as of the date the statements were made. The Company undertakes no obligation to update or revise any forward-looking statements included in this news release if these beliefs, estimates and opinions or other circumstances should change, except as otherwise required by applicable law.
Neither TSX-V nor its Regulation Services Provider (as that term is defined in policies of the TSX-V) accepts responsibility for the adequacy or accuracy of this release.
Legal Notice / Disclaimer: This document is not and should not be construed as an offer to sell or the solicitation of an offer to purchase or subscribe for any investment. GoldSeek.com, have based this document on information obtained from sources it believes to be reliable but which it has not independently verified; GoldSeek.com makes no guarantee, representation or warranty and accepts no responsibility or liability as to its accuracy or completeness. Expressions of opinion are those of GoldSeek.com only and are subject to change without notice. GoldSeek.com assume no warranty, liability or guarantee for the current relevance, correctness or completeness of any information provided within this Report and will not be held liable for the consequence of reliance upon any opinion or statement contained herein or any omission. Furthermore, we assume no liability for any direct or indirect loss or damage or, in particular, for lost profit, which you may incur as a result of the use and existence of the information, provided within this Report.
Additional Disclosure: The owner, editor, writer and publisher and their associates are not responsible for errors or omissions. The author of this report is not a registered financial advisor. Readers should not view this material as offering investment related advice. Authors have taken precautions to ensure accuracy of information provided. Information collected and presented are from what is perceived as reliable sources, but since the information source(s) are beyond our control, no representation or guarantee is made that it is complete or accurate. The reader accepts information on the condition that errors or omissions shall not be made the basis for any claim, demand or cause for action. Past results are not necessarily indicative of future results. Any statements non-factual in nature constitute only current opinions, which are subject to change. The information presented in stock reports are not a specific buy or sell recommendation and is presented solely for informational purposes only. The author/publisher may or may not have a position in the securities and/or options relating thereto, & may make purchases and/or sales of these securities relating thereto from time to time in the open market or otherwise outside of the trading timeframe listed above. Nothing contained herein constitutes a representation by the publisher, nor a solicitation for the purchase or sale of securities & therefore information, nor opinions expressed, shall be construed as a solicitation to buy or sell any stock, futures or options contract mentioned herein. The companies mentioned herein may be sponsor of GoldSeek.com. Investors are advised to obtain the advice of a qualified financial & investment advisor before entering any financial transaction.
The content on this site is protected
by U.S. and international copyright laws and is the property of GoldSeek.com
and/or the providers of the content under license. By "content" we mean any
information, mode of expression, or other materials and services found on GoldSeek.com.
This includes editorials, news, our writings, graphics, and any and all other
features found on the site. Please contact
us for any further information.
Live GoldSeek Visitor Map | Disclaimer
The views contained here may not represent the views of GoldSeek.com, Gold Seek LLC, its affiliates or advertisers. GoldSeek.com, Gold Seek LLC makes no representation, warranty or guarantee as to the accuracy
or completeness of the information (including news, editorials, prices, statistics,
analyses and the like) provided through its service. Any copying, reproduction
and/or redistribution of any of the documents, data, content or materials contained
on or within this website, without the express written consent of GoldSeek.com, Gold Seek LLC,
is strictly prohibited. In no event shall GoldSeek.com, Gold Seek LLC or its affiliates be
liable to any person for any decision made or action taken in reliance upon
the information provided herein.