Advertise | Bookmark | Contact Us | E-Mail List |  | Update Page | UraniumSeek.com 

Commentary : Gold Review : Markets : News Wire : Quotes : Silver : Stocks - Main Page 

 GoldSeek.com >> News >> Story  Disclaimer 
 
Latest Headlines

Gold Seeker Closing Report: Gold and Silver Edge Lower While Stocks Gain
By: Chris Mullen, Gold Seeker Report

Gold Resource Corporation Declares April Monthly Dividend
By: Gold Resource Corporation

Jack Chan's Weekly Precious Metals Update
By: Jack Chan

Earnings: The Big Sucker Play
By: Clive Maund

GoldSeek Radio Nugget: Chris Powell and Chris Waltzek
By: radio.GoldSeek.com

Have You Not Yet Learned - Just Buy The Dip!
By: Avi Gilburt

Camino Continues to Expand Adriana Zone with Northwest Step Out Drilling
By: Camino Minerals Corporation

When Investor Psychology Turns Dark, All News Is Bad News
By: John Rubino

Gold Price Increasingly Influenced By Declining Dollar Rather Than Interest Rates
By: GoldCore

Gold Seeker Closing Report: Gold and Silver Fall Roughly 1%
By: Chris Mullen, Gold Seeker Report

 
Search

GoldSeek Web

 
Zinc One Reports Additional High-Grade Zinc Results from its Bongara Mine Project, Peru

 -- Published: Thursday, 25 January 2018 | Print  | Disqus 

Update on Commencement of Drill Program

Vancouver, British Columbia--(Newsfile Corp. - January 25, 2018) - Zinc One Resources Inc. (TSXV: Z) (OTC Pink: ZZOF) (FSE: RH33) ("Zinc One" or the "Company") has received additional results from an ongoing surface-sampling program at its Bongará Zinc Mine Project in north-central Peru.

Highlights from the program include a surface channel sample (C-011-17) with 45.0 metres of 27.7% zinc and 4.0 metres of 30.5% zinc from an exploration pit (P285-17). All samples were located in the southern end of a 1.4-kilometre long trend of surface and near-surface zinc mineralization in the area referred to as Mina Grande Sur (formerly Fase C).

Jim Walchuck, President and CEO of Zinc One stated, "The high zinc values augment previous high-grade results from samples collected not only at Mina Grande Sur, but at Bongarita and Mina Chica also. All three zones lie within a mineralized system that has been traced for over 1.4 kilometres. The full extent of mineralization potential within this system has not been fully tested and remains open for the discovery of additional, high-grade mineralized zones."

Geology and Discussion of Results

The Bongará zinc-oxide mineralization is stratabound and hosted within carbonate rocks. The carbonate host rock at Mina Grande Sur is principally dolomite breccia and the zinc-oxide mineralization occurs in fractures and void space. It appears that the overall mineralized system occurs along and near an anticlinal fold axis and is mostly contained within a southeasterly plunging tabular body.

The sampling program commenced at the northern end of the trend of known high-grade, zinc-oxide mineralization. The results reported herein include the most recent sampling in the Mina Grande Sur area at the southern end of the trend. The sampling in the Mina Grande Norte zone was completed in early January, with sample results expected in February 2018.

Table 1 below highlights the results from a channel with 45.0 metres of 27.7% zinc from Mina Grande Sur. Table 2 provides a summary of select pit samples from the same area. Since the true strike and dip of the stratabound mineralization is not known, the sample thicknesses from the pits do not necessarily represent the true thickness of the mineralized body. Additional maps and a summary of all results are available on the Company website at www.zincone.com.

Table 1: Mina Grande Sur - Channel Samples

Channel IDFrom (m)To (m)Length (m)Zn, %Pb, %
C-011-170.002.002.007.290.14
C-011-172.004.102.1013.450.24
C-011-174.106.502.4025.600.35
C-011-176.508.502.0051.330.42
C-011-178.5010.001.5036.840.86
C-011-1710.0011.201.2038.660.96
C-011-1711.2013.302.1035.784.54
C-011-1713.3015.302.0041.813.52
C-011-1715.3016.701.4032.4910.00
C-011-1716.7019.002.3022.8010.00
C-011-1719.0019.800.8040.731.29
C-011-1719.8020.400.6017.101.76
C-011-1720.4022.702.3039.390.57
C-011-1722.7025.002.3040.270.64
C-011-1725.0026.001.0038.571.12
C-011-1726.0028.302.303.631.67
C-011-1728.3030.702.403.060.66
C-011-1730.7032.702.003.640.92
C-011-1732.7034.702.003.231.46
C-011-1734.7036.501.8036.120.96
C-011-1736.5038.502.0032.161.63
C-011-1738.5040.902.4040.891.44
C-011-1740.9043.002.1033.870.63
C-011-1743.0045.002.0026.000.29

 

Table 2: Mina Grande Sur - Pit Samples

Pit IDFrom (m)To (m)Length (m)Zn, %Pb, %Thickness (m)Zn, %
P0094. 94-170.001.001.000.510.74

P0094. 94-171.002.001.001.123.45

P0094. 94-172.003.001.0021.4010.00

P0094. 94-173.004.001.0012.851.192.017.10
P0093.94-170.001.001.001.440.42

P0093.94-171.002.001.002.993.35

P0093.94-172.003.001.0040.813.071.040.81
P0112.86-170.001.001.0020.201.74

P0112.86-171.002.001.0029.001.172.024.60
P0294.95-170.001.001.002.901.38

P0294.95-171.002.001.0040.381.441.040.38
P0289.95-170.001.001.0018.151.36

P0289.95-171.002.001.0032.911.20

P0289.95-172.003.001.0021.100.613.024.05
P0285.95-170.001.001.002.101.06

P0285.95-171.002.001.003.063.29

P0285.95-172.003.001.0037.151.36

P0285.95-173.004.001.0031.101.22

P0285.95-174.005.001.0030.091.00

P0285.95-175.006.001.0023.601.274.030.49
P0160.94-170.001.001.0042.561.80

P0160.94-171.002.001.0037.152.97

P0160.94-172.003.001.0035.581.703.038.43
P0115.86-170.001.001.0028.821.92

P0115.86-171.002.001.0040.701.062.034.76
P0304.95-170.001.001.0035.190.44

P0304.95-171.002.001.0024.200.862.029.70

 

Sampling and Analytical Protocols

Zinc One follows a systematic and rigorous Quality Control/Quality Assurance program overseen by Zinc One's Chief Operating Officer, Bill Williams.

Surface sampling in outcrops is a manually collected channel sample. In the case of pits, the sample is channeled vertically. The sample is photographed, then placed into a pre-labeled plastic bag, properly sealed, and identified with a unique sample number. At the project site, Zinc One independently inserts certified control standards, blanks, and duplicates, all of which comprise approximately 30% of the sample batch, to monitor sample preparation and analytical quality. The samples are stored in a secure area until such time they are shipped to the ALS laboratory in Lima (ISO9001 certified) for preparation and assay. At the laboratory, samples are dried, crushed, pulverized and then a four-acid digestion is applied. This is followed by the ICP-AES analytical technique for 33 elements, including lead. Zinc is assayed by the same method for values up to 20%. If zinc exceeds 20%, it is analyzed by titration methods. The laboratory also inserts blanks and standards as well as including duplicate analyses.

Drill Program Update

The previously announced drill program at Bongará (see News Release from December 13, 2017) is expected to commence imminently, following the December approval of 124 drill platforms by the Peruvian Ministry of Energy and Mines. Two portable drill rigs are currently being mobilized to the project site, where nearly all 15 permitted platforms at Bongarita, located at the north end of the 1.4-km long trend of zinc mineralization, have been prepared for drilling. In addition, preparation of over two dozen platforms permitted at Mina Grande Sur, in the southern end of the mineralized trend, is in progress. After drilling of these areas is completed, the rigs will move to the Mina Grande Norte and Mina Grande Centro areas, respectively.

Results of the drill program at Bongarita, Mina Chica, and Mina Grande Sur will be used to better define the thickness and lateral extent of the mineralization that was not previously delineated by the surface channel and pit sampling nor by previous drilling. This additional work at Bongará will continue to form the basis for advancement the development timeline.

About Zinc One Resources Inc.

Zinc One is focused on the acquisition, exploration and development of prospective and advanced zinc projects in mining-friendly jurisdictions. Zinc One's key assets are the Bongará Mine and Charlotte-Bongará Zinc Projects in north-central Peru. The Bongará Zinc Mine Project was in production from 2007 to 2008, but shut down due to the global financial crisis and concurrent decrease in the zinc price. Past production included 20% zinc grades and recoveries over 90% from surface and near-surface zinc-oxide mineralization. High-grade, zinc-oxide mineralization is known to outcrop between the mined area and the Charlotte-Bongará Zinc-Oxide Project, which is nearly six kilometres to the NNW and where past drilling intercepted various near-surface zones with high-grade zinc. Zinc One is managed by a proven team of geologists and engineers who have previously constructed and operated successful mining operations.

The technical content of this news release has been reviewed, verified and approved by Bill Williams, COO and Director of Zinc One, a qualified person as defined by National Instrument 43-101.

Further Information

Monica Hamm
VP, Investor Relations
Zinc One Resources Inc.
Phone: (604) 974-5274
Email:
mhamm@zincone.com

Forward-Looking Statements

Information set forth in this news release contains forward-looking statements that are based on assumptions as of the date of this news release. These statements reflect management's current estimates, beliefs, intentions and expectations. They are not guarantees of future performance. Zinc One cautions that all forward looking statements are inherently uncertain and that actual performance may be affected by a number of material factors, many of which are beyond their respective control. Such factors include, among other things: risks and uncertainties relating to Zinc One's limited operating history, its proposed exploration and development activities on the Bongará Zinc Oxide Project and the need to comply with environmental and governmental regulations.  Accordingly, actual and future events, conditions and results may differ materially from the estimates, beliefs, intentions and expectations expressed or implied in the forward looking information. Except as required under applicable securities legislation, Zinc One does not undertake to publicly update or revise forward-looking information.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the Exchange) accepts responsibility for the adequacy or accuracy of this release.

 


| Digg This Article
 -- Published: Thursday, 25 January 2018 | E-Mail  | Print  | Source: GoldSeek.com

comments powered by Disqus







 



Increase Text SizeDecrease Text SizeE-mail Link of Current PagePrinter Friendly PageReturn to GoldSeek.com

 news.goldseek.com >> Story

E-mail Page  | Print  | Disclaimer 


© 1995 - 2017



GoldSeek.com Supports Kiva.org

© GoldSeek.com, Gold Seek LLC

The content on this site is protected by U.S. and international copyright laws and is the property of GoldSeek.com and/or the providers of the content under license. By "content" we mean any information, mode of expression, or other materials and services found on GoldSeek.com. This includes editorials, news, our writings, graphics, and any and all other features found on the site. Please contact us for any further information.

Live GoldSeek Visitor Map | Disclaimer

The views contained here may not represent the views of GoldSeek.com, its affiliates or advertisers. GoldSeek.com makes no representation, warranty or guarantee as to the accuracy or completeness of the information (including news, editorials, prices, statistics, analyses and the like) provided through its service. Any copying, reproduction and/or redistribution of any of the documents, data, content or materials contained on or within this website, without the express written consent of GoldSeek.com, is strictly prohibited. In no event shall GoldSeek.com or its affiliates be liable to any person for any decision made or action taken in reliance upon the information provided herein.